Home Company Info Product List Contact Details
Homeproduct Directory

Automatic control box

Automatic control box
company Guangdong Jiangmen Liyuan Pump Industry Co., Ltd.
Categories LED Displays
Update2011-04-12
Original RegionChina
Automatic control box
Performance Parameters
Specifications for each pump power of automaticcontrol box to configure the same power;
Control box placed no direct sun and rain,well- ventilated place, avoid strong shock;
Knife switch three-phase power through theintroduction of FireWire, zero line of directintroduction;
Fuses selected: Fusing current = motor ratedcurrent X(1.5~2)
Water and the water level of control towerswere only one electrode wire and a wire loop.Upper and lowerwater level is to use adedicated "sub-bit device" to distinguish. Ofthese,only one wire end through the electrodewire access box of the "very well" or "TowerPole" terminals on the other side there are twowires,the shorter a wire electrode cap for thewater level line,a longer a wire electrode forthe minimum water level lines, and eachreceived an electrode probeplaced in the waterlevel can be required, if less thantherequired depth electrode suspended may be addedto extend the access wire. Loop electrodes mustbe placed under the upper and lower electrodes;
The electrode lines, telegraph and Tap (pool)can not short-circuit between the wall;
Adequate water, the water level down to pumpinlet is not the occasion, you can not install"Well electrode",but the Department must be themain circuit board of micro-toggle switch dialto the right (or in the terminals will be"extremely well" and " loop "using wireshorted). On the contrary shall be allocated tothe left;
Functional use
1)Canadian-controlled electronic protection level:The main circuit board at the top of the mini-twistor switch shall be allocated to the right of self-control level; and then the main switch panel on the spin to the "left" side shall be electronic protection
2)Hand-controlled electronic protection: The maincircuit board twistor switches shall be allocated tothe left hand control panel main switch is still spin to the "left" side
3)Relay: The main switch panel spin to the "right"side can be. At this point the main circuit board does not work
4)Priority should be given the use of electronic protection
5)Lack of phase, overload protection function tests:
The lower part of the right side of the main circuit board of the four micro-button, one is overloading the above tests, the following three-phase trials are missing.The normal operation of the pump state,namely,one pressed a button does not move,should be automatically in 5 seconds, tripping,and self-locking.Note fault protection function was normal. Each auto-Trip
,It should first reset the upcoming Rotary main switch to "stop" position, wait 15 seconds kinds,you can re- boot to normal
Note
1)Relay choices are involved in any kind offunctional role, but because of the sensitivity worse than the electronic protection,it should give priority to use "electronic protection", in real terms for dual protection
2)The use of electronic protection, stop and then start to be intervals of 15 seconds or more, otherwise they will be "memory" effect, the formation of a false overload protection shutdown.But does not belong to failure, to re-wait 15 seconds after shutdown and then boot can be
Automatic control box
Automatic control box
Starter
Computer Controller

Automatic control box on sale

Products Showcase

See more products from this supplier.

Do you want to show products of your own company? Join FREE now!

You may also be interested in: